Development History

Home > Company > Development History

Development history

In 2005, Desheng Nickel Industry Co., Ltd. was established and began to constructed.

In 2009, the main processes, such as blast furnace, steel making and hot rolling, were completed and put into trial production.

In 2010, Desheng Nickel signed a restructuring agreement with Baosteel Group.

In 2011, Baosteel Desheng officially unveiled

In 2012, 4# submerged arc furnace was put into operation. 

In 2013, 3#, 2#, 1# submerged arc furnaces was put into operation.

In 2014, BN1TP (tubing products) and BD11 (medium nickel product) were developed successfully.

In 2015, DRAP unit of cold-rolling plant was tested in hot load.

In 2016, 400 series ferrite products and low carbon austenitic products were successfully developed.

In 2017,the company’s output value exceeds ten billion yuan.

In 2018, HRAPL unit of cold rolling mill successfully rolled the first roll of black rolls.

5.7 million-ton industrial planning of Baosteel Desheng passed the review of the Board of Directors of China Baowu.

Quality Stainless Steel Green Industry Base of Baosteel Desheng was under construction.


Copyright © 2019 Baosteel Desheng Stainless SteelCo., Ltd. 闽ICP备09041973号-1
百度 搜狗 360搜索 外媒:也门胡塞武装称袭击美国航空母舰 贝爷生擒三米长蟒蛇 天热没胃口 主要缺带个围脖!《荒野求生》 喜马拉雅旗下喜攀公司增资至28亿 《打字是你的谎言》 LIama 4疑似作弊,都怪Meta把牛皮吹破了

      <code id='5b441'></code><style id='f573d'></style>
    • <acronym id='2dc9b'></acronym>
      <center id='72671'><center id='cf185'><tfoot id='cd598'></tfoot></center><abbr id='b004c'><dir id='1c9b1'><tfoot id='5fbab'></tfoot><noframes id='17950'>

    • <optgroup id='59b0e'><strike id='f340f'><sup id='365be'></sup></strike><code id='f6835'></code></optgroup>
        1. <b id='6d178'><label id='5f4ef'><select id='fb058'><dt id='ab73a'><span id='f1aa5'></span></dt></select></label></b><u id='2fc72'></u>
          <i id='9df24'><strike id='fd720'><tt id='87489'><pre id='1b932'></pre></tt></strike></i>